Civil Engineering works
Gamma Construction Ltd is renowned for its road network development and maintenance expertise. Year in year out, we have sharpened this expertise and we are nowadays a prominent figure in road maintenance, resurfacing and asphalting. We invest in state-of-the-art plant and machinery to demonstrate our commitment to quality.
Client: Road Development Authority
Description: The works consisted of the following:
- · Construction of an additional third lane, width 4.0m with hard shoulder, of approximately 3.1 km on each side of the motorway M2 from Roche Bois roundabout to Jin Fei roundabout
- · Construction of an additional lane on the existing roundabouts
- · Refurbishment works for culverts and overpass
- · Construction of roadside drains, absorption pits
Year of Completion: 2019
Contract Value: MUR 330 M
Client: Road Development Authority
Description: Construction of a third lane to Grand Bassin along B88 from Gouly to Bois Cheri
Year of Completion: 2018
Contract Value: MUR 57 M
Client: Road Development Authority
Description: Upgrading of both the horizontal and vertical alignments of the existing radier of an approximate length of 92.7 m along B9 road
- · Upgrading of the road to the Radier St Martin
- · Upgrading of the Radier St Martin
- · Construction of box culverts on rotary piles
Year of Completion: 2018
Contract Value: MUR 75 M
Client: Mauritius Port Authority
Description: The project salient features are as follows:
- Excavation of existing roads
- Preparation of subgrade and new road structure
- Laying of drains, where required
- Laying of kerbs and casting of new footpath
- New asphalt works
Year of completion: 2018
Contract Value: MUR 26 M
Client: Doger de Speville
Description: The works consist of:
- Morcellement works,
- Preparing sub-base and asphalting the access roads within the morcellement
- Construction of a 20-metre-long bridge across Riviere Profonde to facilitate access to the Residential development area
Year of completion: 2018
Contract Value: MUR 26 M
Client: Road Development Authority
Description: The works consist of:
- upgrading works,
- construction of a third lane,
- widening of two bridges of span 12m and 14m respectively
Year of completion: 2018
Contract Value: MUR 57 M
Client: Gamma
Description: The project consisted of:
- Conversion of existing track road into a tarred road in order to relieve traffic at La Marie junction in both directions
- Improvement of vertical & horizontal alignment with Tie-in to private lateral accesses
Year of completion: 2018
Contract Value: MUR 20 M
Client: Arthur & Morgane Ltd
Description: Construction of sub-base and Asphalting of all internal roads and main entrance of Avalon Golf Estate
Year of completion: 2016
Contract Value: MUR 42 M
Client: Road Development Authority
Description: The project consisted of:
- Upgrading and re-profiling of existing road
- Construction of masonry retaining walls
- Construction of box culvert and pipe culvert
- Fixing of guardrails
Year of completion: 2016
Contract Value: MUR 23 M
Client: Airports of Mauritius Ltd
Description: The works consist of:
- Construction of Roads,
- Associated civil works and
- Water reticulation network including laying of water pipes, building a 2000 m3 water tank and a pump room
Year of completion: 2016
Contract Value: MUR 419.5 M
Client: Road Development Authority
Description: The project consisted of:
- Upgrading of existing Hillcrest Avenue in Sodnac over its total length of 1.15 km from Tulipes to Hirondelles both sides
- Re-profiling and Resurfacing of the road, including slopes for drainage
- Provision of 1.5m wide footpath on both sides of the road
- Provision of drains along the whole length of the road
- Provision of road lighting
- Provision of miscellaneous road safety features (road markings, handrails, traffic signs, cat’s eyes etc)
Year of completion: 2015
Contract Value: MUR 78 M
Client: Road Development Authority
Description: Roads and associated civil works including resurfacing works, drainage works and construction of footpath
Year of completion: 2014
Contract Value: MUR 247 M
JV with BCEG, with Gamma as lead Partner
Client: Road Development Authority
Description: Construction of about 8.5Km (Verdun- Trianon link) and 3Km (Bagatelle-Valentina link) two lane dual carriageway new road, Construction of grade separators, Construction of Roundabouts, Construction of Bridges on river Terre Rouge, Cascade, Aubert, Feeder Jacqout and Plaine Wilhems, Construction of retaining walls, cross drainage works, temporary traffic diversions and Road furnitures and equipments.
Year of completion: 2014
Contract Value: MUR 1.58 Billion
Client: SIT Property Development Limited
Description: Infrastructural works including road networks, drainage networks, water reticulation, sewer network, electricity, telecom networks etc.
Year of completion: 2014
Contract Value: MUR 380 M
Client: Road Development Authority
Description: Upgrading of existing Schoenfeld Road over a length of 1.2km, Construction of a new 7m wide carriageway over a length of 1.4Km and shoulder 2.5m wide, Construction of 2 bridges, masonry wall, drainage structures and road furnitures and equipments.
Year of completion: 2013
Contract Value: MUR 138 M
Client: Road Development Authority
Description: Realignment and widening of about 2.4Km of existing road to a 7.3 metres wide carriageway and a hard shoulder of 1.5 metres wide, widening of culverts, construction of links to Phase 2 of the Upgrading of Quartier Militaire Road (B6) and entrance to Julien d’Hotman Village, Various drainage structures and Road furnitures.
Year of completion: 2013
Contract Value: MUR 182.7 M
Client: Road Development Authority
Description: Widening of Motorway M1 on both sides over a length of 3.2Km to provide an additional lane of 3.5m wide and hard shoulder of 1.5m wide, extension of various drainage structures type box-culvert and pipes, extension of pedestrian underpass at St Jean and other road furnitures.
Year of completion: 2012
Contract Value: MUR 133 M
Client: Road Development Authority
Description: Widening of Motorway M1 from St Jean to Colville on both sides over a length of about 7km and widening of 6 Nos. bridges, composed of pre-stressed beams and slabs. Bridges spans ranging from 14m to 17m
Year of completion: 2012
Contract Value: MUR 238 M
Client: Road Development Authority
Description: Construction of about 5.0 km of 7.4 metres wide carriageway and a hard shoulder of 2.0 metres wide with flexible pavement and about 1.1Km of access roads, Construction of four roundabouts and other road structures and furnitures.
Year of completion: 2011
Contract Value: MUR 294 M
Client: Road Development Authority
Description: Widening of about 2.4Km of existing road to a 7.3 metres wide carriageway with hard shoulders of 1.5 metres wide on both sides, demolition and reconstruction of Couacaud Bridge and other culverts, Construction of a Roundabout at Belle Rive, various drainage structures and road funitures.
Year of completion: 2009
Contract Value: MUR 139 M
Client: Gamma
Description: Civil works, Erection, Stone crusher & blocks plant, Weighbridge, administrative block, access road
Year of completion: 2005
Contract Value: MUR 200 M
Client: Airport Development Corp. Ltd
Description: Runway extension with asphalt overlay
Year of completion: 1975
Contract Value: MUR 6 M